Booked your space at ELECRAMA 2027? This page is for exhibitors who want a stand that stops electrical and power equipment buyers in the aisle and is ready on time. Vibranium Live is a Mumbai based team that designs, fabricates and installs exhibition stalls across India, and we work back from the organiser's deadlines from day one.
Show at a glance
- Show: ELECRAMA 2027
- Dates: 20 to 24 February 2027
- Venue: India Expo Mart, Greater Noida, NCR
- Organiser: the Indian Electrical and Electronics Manufacturers' Association (IEEMA)
- Official site: www.elecrama.com
Dates and venues come from the organiser's website. Always check the official site and your exhibitor manual for the latest details.
Designing for this show
Electrical equipment stands often combine heavy products like transformers and switchgear with live digital demos. Plan floor load, power for demos, clear product labelling, and meeting rooms for technical and procurement discussions.
Beyond the exhibits, think about what you want a visitor to do in the first 30 seconds: notice a single clear message from the aisle, find a person to talk to, and know where to sit down for a serious conversation. We design the layout around that path, then add display, storage and back of house space.
Your stall timeline for ELECRAMA 2027
Your exhibitor manual sets the real deadlines. A typical plan looks like this:
- As soon as space is confirmed: send us the stall number, size, open sides, budget range and the exhibitor manual. We return a written brief.
- 8 to 10 weeks before the show: concept, moodboards and 3D design rounds.
- 6 to 8 weeks before: design locked. Drawings prepared for organiser approval.
- Before the organiser's design deadline: drawings submitted, contractor registration done, power and services ordered.
- 3 to 4 weeks before: fabrication, graphics, AV and furniture.
- Build up days: install inside the venue's build up window, followed by a walk through with your team.
- After the show: dismantling within the breakdown window, and a short review.
If you are reading this close to the show, contact us anyway. We will tell you honestly what can be built in the time left.
Check these in the ELECRAMA 2027 exhibitor manual
- Stand design submission deadline and drawing formats
- Maximum build height, and rules for double decker stands and rigging
- Raw space or shell scheme, and what the shell includes
- Contractor registration, passes and any security deposit
- Electrical load, the deadline to order power, and other services such as water or compressed air
- Fire safety rules, permitted materials and exit widths
- Build up and dismantling dates and hours, and late work permissions
- Floor load, vehicle entry and material movement rules at the venue
Send us the manual at the brief stage. We turn it into a checklist with owners and dates so nothing is missed.
Coming from another city?
If your team is travelling to the show, plan travel and stay for the people who will staff the stand, and fix a time on the last build up day for a full walk through. We coordinate transport of stand material and any exhibits that ship with the build, so your team only needs to arrive, check the stand and get ready for visitors.
What we handle
- Concept and 3D stand design
- Organiser approval drawings
- Fabrication with line item costing
- Graphics, lighting, AV and furniture
- Install, a producer on the floor through the show, and dismantling
Why exhibitors work with us
- Design first. Real time on concept and stand design before anything is built.
- Line item costing, so you can see what each part of the stand costs.
- One accountable producer from brief to dismantling.
- Pan India reach from our Mumbai base, so one team can handle your shows across cities.
Stalls we have delivered
Two exhibition stalls from our portfolio, to show the kind of design and build work we do. They were not built for this show.
- Cookie Run Stall, exhibition stall for Krafton.

- BIAL Stall, Mumbai, exhibition stall for BIAL.
